Spindle tooling export to United Kingdom | BQUQ manufacturing notes

From the enquiry desk: separate one-time tooling cost from unit price, and confirm who owns the die or mould, where it is stored, its expected service life and the policy for repair or replacement.
What to send us
| Field | What we record |
|---|---|
| Before quoting / What to send us | aluminum extrusion — TOOLING |
| Process note | Alloy / temper, drawing, finish and inspection state confirmed per order |
| Evidence | Order records and measurement sheets are kept on file; no published price is claimed |
FAQ
How long does a first article take on aluminum extrusion?
First-article timing depends on whether tooling exists. We give the date from the actual schedule, not a published average.
What do you need before quoting aluminum extrusion?
Send the drawing, alloy or grade and temper, quantity, finish and the inspection state you need checked. We confirm each line before tooling.
How is tolerance checked on aluminum extrusion parts?
Each tolerance callout is tied to a feature, a state (as-extruded, machined or after finishing) and a measurement method. We record the result on the order sheet.
Dongguan ZuanXin Plastic Hardware Co. LTD · USCC 91441900MA4UT74C2G
Related field notes
- Field note · spindle tooling factory export Russia
- Field note · tool holder sample test report
- Field note · custom spindle tooling OEM factory
- Field note · tooling holder factory QC process


