Our approach to CNC machining third party lab test report
.
The useful answer depends on the drawing, but the starting point is this: Ask for the inspection plan: incoming material check, in-process control points, final inspection criteria, the measuring equipment.
What to send us
| Field | What we record |
|---|---|
| Before quoting / What to send us | aluminum extrusion — QUALITY |
| Process note | Alloy / temper, drawing, finish and inspection state confirmed per order |
| Evidence | Order records and measurement sheets are kept on file; no published price is claimed |
FAQ
Can the drawing be changed after tooling starts?
Small changes are reviewed against the die or program before we commit; we tell you what is affected rather than restarting silently.
Which inspection records come with the order?
Dimensional checks, finish records and the packing list are kept with the order number and can be referenced on a repeat order.
How long does a first article take on aluminum extrusion?
First-article timing depends on whether tooling exists. We give the date from the actual schedule, not a published average.
Dongguan ZuanXin Plastic Hardware Co. LTD · USCC 91441900MA4UT74C2G
Related field notes
- Field note · precision CNC milling turning parts factory
- Field note · CNC machining manufacturer export USA
- Field note · CNC machining ISO9001 factory
- Field note · precision CNC turning parts OEM


