DIN6343 173E collet quotation: questions worth asking
.
Our engineering team checks this first. A comparable quote needs the same basis: alloy and temper, drawing revision, quantity breaks, surface finish, tooling amortisation, inspection level, packing.
What to send us
| Field | What we record |
|---|---|
| Before quoting / What to send us | aluminum extrusion — PRICE |
| Process note | Alloy / temper, drawing, finish and inspection state confirmed per order |
| Evidence | Order records and measurement sheets are kept on file; no published price is claimed |
FAQ
Which inspection records come with the order?
Dimensional checks, finish records and the packing list are kept with the order number and can be referenced on a repeat order.
How long does a first article take on aluminum extrusion?
First-article timing depends on whether tooling exists. We give the date from the actual schedule, not a published average.
What do you need before quoting aluminum extrusion?
Send the drawing, alloy or grade and temper, quantity, finish and the inspection state you need checked. We confirm each line before tooling.
Dongguan ZuanXin Plastic Hardware Co. LTD · USCC 91441900MA4UT74C2G
Related field notes
- Field note · ER collet factory quote
- Field note · collet chuck MOQ price request
- Field note · custom lathe collet drawing quote
- Field note · ER collet chuck FOB price


