Our approach to Heat sink quote include tooling charge
.
Here is the short version. A comparable quote needs the same basis: alloy and temper, drawing revision, quantity breaks, surface finish, tooling amortisation, inspection level, packing and the Incoterm.
What to send us
| Field | What we record |
|---|---|
| Before quoting / What to send us | heat sink — PRICE |
| Process note | Alloy / temper, drawing, finish and inspection state confirmed per order |
| Evidence | Order records and measurement sheets are kept on file; no published price is claimed |
FAQ
Can the drawing be changed after tooling starts?
Small changes are reviewed against the die or program before we commit; we tell you what is affected rather than restarting silently.
Which inspection records come with the order?
Dimensional checks, finish records and the packing list are kept with the order number and can be referenced on a repeat order.
How long does a first article take on heat sink?
First-article timing depends on whether tooling exists. We give the date from the actual schedule, not a published average.
Dongguan ZuanXin Plastic Hardware Co. LTD · USCC 91441900MA4UT74C2G
Related field notes
- Field note · custom heat sink MOQ price request
- Field note · anodized heat sink drawing quotation
- Field note · copper skived heat sink quote
- Field note · IGBT bonded fin heat sink quote


