Heatsink extrusion mold development supplier — engineering checklist
.
What we confirm before pricing: Separate one-time tooling cost from unit price, and confirm who owns the die or mould, where it is stored, its expected service life.
What to send us
| Field | What we record |
|---|---|
| Before quoting / What to send us | heat sink — TOOLING |
| Process note | Alloy / temper, drawing, finish and inspection state confirmed per order |
| Evidence | Order records and measurement sheets are kept on file; no published price is claimed |
FAQ
Can the drawing be changed after tooling starts?
Small changes are reviewed against the die or program before we commit; we tell you what is affected rather than restarting silently.
Which inspection records come with the order?
Dimensional checks, finish records and the packing list are kept with the order number and can be referenced on a repeat order.
How long does a first article take on heat sink?
First-article timing depends on whether tooling exists. We give the date from the actual schedule, not a published average.
Dongguan ZuanXin Plastic Hardware Co. LTD · USCC 91441900MA4UT74C2G
Related field notes
- Field note · custom heat sink sample request
- Field note · heat sink shipping to EU
- Field note · heat sink factory production capacity
- Field note · small batch custom heat sink supplier


