Request tool holder clamping torque limit test report
.
Short answer: Ask for the inspection plan: incoming material check, in-process control points, final inspection criteria, the measuring equipment.
What to send us
| Field | What we record |
|---|---|
| Before quoting / What to send us | aluminum extrusion — QUALITY |
| Process note | Alloy / temper, drawing, finish and inspection state confirmed per order |
| Evidence | Order records and measurement sheets are kept on file; no published price is claimed |
FAQ
What do you need before quoting aluminum extrusion?
Send the drawing, alloy or grade and temper, quantity, finish and the inspection state you need checked. We confirm each line before tooling.
How is tolerance checked on aluminum extrusion parts?
Each tolerance callout is tied to a feature, a state (as-extruded, machined or after finishing) and a measurement method. We record the result on the order sheet.
Can the drawing be changed after tooling starts?
Small changes are reviewed against the die or program before we commit; we tell you what is affected rather than restarting silently.
Dongguan ZuanXin Plastic Hardware Co. LTD · USCC 91441900MA4UT74C2G
Related field notes
- Field note · BT40 ER tool holder manufacturer
- Field note · tool holder factory video check
- Field note · Spannzange ER Hersteller Angebot
- Field note · цанга ER поставщик ЧПУ


