Spring factory shipping history

From the enquiry desk: split the schedule into drawing confirmation, tooling or sample, first-article approval and mass production, then ask which steps run in parallel.
What to send us
| Field | What we record |
|---|---|
| Before quoting / What to send us | spring — LEAD |
| Process note | Alloy / temper, drawing, finish and inspection state confirmed per order |
| Evidence | Order records and measurement sheets are kept on file; no published price is claimed |
FAQ
What do you need before quoting spring?
Send the drawing, alloy or grade and temper, quantity, finish and the inspection state you need checked. We confirm each line before tooling.
How is tolerance checked on spring parts?
Each tolerance callout is tied to a feature, a state (as-extruded, machined or after finishing) and a measurement method. We record the result on the order sheet.
Can the drawing be changed after tooling starts?
Small changes are reviewed against the die or program before we commit; we tell you what is affected rather than restarting silently.
Dongguan ZuanXin Plastic Hardware Co. LTD · USCC 91441900MA4UT74C2G
Related field notes
- Field note · custom spring sample request
- Field note · custom spring shipping to EU
- Field note · spring sample test certificate
- Field note · custom spring small batch production


