How we handle Short lead time stamping prototype

Short answer: split the schedule into drawing confirmation, tooling or sample, first-article approval and mass production, then ask which steps run in parallel.
What to send us
| Field | What we record |
|---|---|
| Before quoting / What to send us | aluminum extrusion — LEAD |
| Process note | Alloy / temper, drawing, finish and inspection state confirmed per order |
| Evidence | Order records and measurement sheets are kept on file; no published price is claimed |
FAQ
How is tolerance checked on aluminum extrusion parts?
Each tolerance callout is tied to a feature, a state (as-extruded, machined or after finishing) and a measurement method. We record the result on the order sheet.
Can the drawing be changed after tooling starts?
Small changes are reviewed against the die or program before we commit; we tell you what is affected rather than restarting silently.
Which inspection records come with the order?
Dimensional checks, finish records and the packing list are kept with the order number and can be referenced on a repeat order.
Dongguan ZuanXin Plastic Hardware Co. LTD · USCC 91441900MA4UT74C2G
Related field notes
- Field note · stamped metal part sample request
- Field note · stamping parts shipping to EU
- Field note · stamping sample test certificate
- Field note · custom stamping small batch production