A practical note on Thermal sink drawing DFM review
.
Short answer: Send a controlled drawing package: 3D model plus 2D drawing with tolerances, datums, material and finish,.
What to send us
| Field | What we record |
|---|---|
| Before quoting / What to send us | heat sink — DESIGN |
| Process note | Alloy / temper, drawing, finish and inspection state confirmed per order |
| Evidence | Order records and measurement sheets are kept on file; no published price is claimed |
FAQ
How is tolerance checked on heat sink parts?
Each tolerance callout is tied to a feature, a state (as-extruded, machined or after finishing) and a measurement method. We record the result on the order sheet.
Can the drawing be changed after tooling starts?
Small changes are reviewed against the die or program before we commit; we tell you what is affected rather than restarting silently.
Which inspection records come with the order?
Dimensional checks, finish records and the packing list are kept with the order number and can be referenced on a repeat order.
Dongguan ZuanXin Plastic Hardware Co. LTD · USCC 91441900MA4UT74C2G
Related field notes
- Field note · heat sink third party audit
- Field note · heat sink ISO certificate validation
- Field note · thermal sink supplier on-site audit
- Field note · heat sink factory compliance audit


