How BQUQ reviews thermal sink supplier on-site audit: drawing, alloy, temper, finish and inspection state.
How we handle Thermal sink supplier on-site audit
.
What we confirm before pricing: Check the legal entity rather than the brand name: ask for the registered company name, the unified business registration number, the registered address.
What to send us
| Field | What we record |
|---|---|
| Before quoting / What to send us | heat sink — VERIFY |
| Process note | Alloy / temper, drawing, finish and inspection state confirmed per order |
| Evidence | Order records and measurement sheets are kept on file; no published price is claimed |
FAQ
How long does a first article take on heat sink?
First-article timing depends on whether tooling exists. We give the date from the actual schedule, not a published average.
What do you need before quoting heat sink?
Send the drawing, alloy or grade and temper, quantity, finish and the inspection state you need checked. We confirm each line before tooling.
How is tolerance checked on heat sink parts?
Each tolerance callout is tied to a feature, a state (as-extruded, machined or after finishing) and a measurement method. We record the result on the order sheet.
Dongguan ZuanXin Plastic Hardware Co. LTD · USCC 91441900MA4UT74C2G
Related field notes
- Field note · heat sink third party audit
- Field note · thermal sink drawing DFM review
- Field note · heat sink ISO certificate validation
- Field note · heat sink factory compliance audit



