Get a Fast Quote for This Part
Send us your drawing / quantity / material — reply within 24h.
Get a quote
Get a Fast Quote for This Part
Send us your drawing / quantity / material — reply within 24h.

The practical answer is straightforward. specify the alloy or grade, temper, applicable standard and the mill certificate requirement on the drawing. Ask which material lots will be used.
| Field | What we record |
|---|---|
| Before quoting / What to send us | aluminum extrusion — MATERIAL |
| Process note | Alloy / temper, drawing, finish and inspection state confirmed per order |
| Evidence | Order records and measurement sheets are kept on file; no published price is claimed |
First-article timing depends on whether tooling exists. We give the date from the actual schedule, not a published average.
Send the drawing, alloy or grade and temper, quantity, finish and the inspection state you need checked. We confirm each line before tooling.
Each tolerance callout is tied to a feature, a state (as-extruded, machined or after finishing) and a measurement method. We record the result on the order sheet.
Dongguan ZuanXin Plastic Hardware Co. LTD · USCC 91441900MA4UT74C2G
Cost elements, tooling amortisation, tolerance limits and compliance documents — written from production data.
Straight answers from the factory, not a sales brochure.