How BQUQ reviews extrusion press production capacity: drawing, alloy, temper, finish and inspection state.
What to know about Extrusion press production capacity
.
In practice, it works like this: Ask for capacity in the unit that matches your order: parts per shift, press or machine hours, and the current loading of the specific process. Confirm what is in-house.
What to send us
| Field | What we record |
|---|---|
| Before quoting / What to send us | heat sink — CAPACITY |
| Process note | Alloy / temper, drawing, finish and inspection state confirmed per order |
| Evidence | Order records and measurement sheets are kept on file; no published price is claimed |
FAQ
How long does a first article take on heat sink?
First-article timing depends on whether tooling exists. We give the date from the actual schedule, not a published average.
What do you need before quoting heat sink?
Send the drawing, alloy or grade and temper, quantity, finish and the inspection state you need checked. We confirm each line before tooling.
How is tolerance checked on heat sink parts?
Each tolerance callout is tied to a feature, a state (as-extruded, machined or after finishing) and a measurement method. We record the result on the order sheet.
Dongguan ZuanXin Plastic Hardware Co. LTD · USCC 91441900MA4UT74C2G
Related field notes
- Field note · custom heat sink sample request
- Field note · heat sink shipping to EU
- Field note · heat sink factory production capacity
- Field note · small batch custom heat sink supplier



