What our engineering team checks for heatsink surface finish quality inspection. Drawing, alloy and inspection requirements explained.
Our approach to Heatsink surface finish quality inspection

The useful answer depends on the drawing, but the starting point is this: agree tolerances on the drawing before the quotation is issued. Mark critical dimensions and datums, state the measurement method (caliper, CMM, optical).
What to send us
| Field | What we record |
|---|---|
| Before quoting / What to send us | heat sink — TOLERANCE |
| Process note | Alloy / temper, drawing, finish and inspection state confirmed per order |
| Evidence | Order records and measurement sheets are kept on file; no published price is claimed |
FAQ
Can the drawing be changed after tooling starts?
Small changes are reviewed against the die or program before we commit; we tell you what is affected rather than restarting silently.
Which inspection records come with the order?
Dimensional checks, finish records and the packing list are kept with the order number and can be referenced on a repeat order.
How long does a first article take on heat sink?
First-article timing depends on whether tooling exists. We give the date from the actual schedule, not a published average.
Dongguan ZuanXin Plastic Hardware Co. LTD · USCC 91441900MA4UT74C2G
Related field notes
- Field note · skived fin heat sink OEM inquiry
- Field note · bonded fin thermal heat sink factory
- Field note · thermal management solution supplier
- Field note · thermal simulation test report



