Lathe chuck inspection report: questions worth asking
.
The useful answer depends on the drawing, but the starting point is this: Agree tolerances on the drawing before the quotation is issued. Mark critical dimensions and datums, state the measurement method (caliper, CMM, optical).
What to send us
| Field | What we record |
|---|---|
| Before quoting / What to send us | aluminum extrusion — TOLERANCE |
| Process note | Alloy / temper, drawing, finish and inspection state confirmed per order |
| Evidence | Order records and measurement sheets are kept on file; no published price is claimed |
FAQ
Which inspection records come with the order?
Dimensional checks, finish records and the packing list are kept with the order number and can be referenced on a repeat order.
How long does a first article take on aluminum extrusion?
First-article timing depends on whether tooling exists. We give the date from the actual schedule, not a published average.
What do you need before quoting aluminum extrusion?
Send the drawing, alloy or grade and temper, quantity, finish and the inspection state you need checked. We confirm each line before tooling.
Dongguan ZuanXin Plastic Hardware Co. LTD · USCC 91441900MA4UT74C2G
Related field notes
- Field note · BT40 ER tool holder manufacturer
- Field note · tool holder factory video check
- Field note · Spannzange ER Hersteller Angebot
- Field note · цанга ER поставщик ЧПУ