Stamping Quality Control: 3 Inspection Gates Every Batch Must Pass
Transcript
Every part you see here gets checked.
Not sampled - checked.
First article, in-process, and final inspection: three gates, every batch.
Dimensional reports, material certificates, and full traceability back to the coil number.
Our tolerances hold at ten microns, and that's measured, not claimed.
If a batch doesn't pass, it doesn't ship.
Simple as that.
Send your drawing, and you'll have a quote back in twelve hours.
bquq.com
Frequently asked questions
What inspection does each stamping batch get?
Three gates: first article inspection before the run starts, in-process checks during production, and final inspection before shipping. Every batch, 100%.
Do you provide inspection reports?
Yes. Every batch ships with a dimensional report, and material certificates are available, with traceability back to the coil number.
What happens if a batch fails inspection?
It does not ship. The batch is held, the root cause is corrected, and the parts are re-made and re-inspected before release.
Are your tolerances verified or claimed?
Verified. We hold ten microns on key features and it is measured with calibrated instruments - not a marketing figure.
Are you ISO certified?
BQUQ operates under ISO9001 quality management, applied to stamping, CNC machining, springs and heat sinks.
Talk to an engineer
CNC machining · metal stamping · custom springs · heat sinks — ISO9001 source factory in Dongguan, China. ±0.005mm process control, quote within 12 hours.
Email sc@bquq.com | WhatsApp +86 13713157787 | www.bquq.com