precision metal parts price list 2026

Quick answer

precision metal parts price list 2026: Copper C110, tolerance 0.002 mm on request, surface hard chrome plate 0.025 mm, lead time 10 working days, MOQ 500 pcs. Capacity for robotics. Drawing review and first-article report included.

precision metal parts price list 2026
By BQUQ Editorial Team Reviewed by BQUQ Quality Engineering Oct 6, 2026 views ISO 9001:2015 Certified Factory

precision metal parts price list 2026

Key Takeaway

Precision metal parts price list 2026 for brass C360 with electropolish Ra 0.2 depends on secondary operations, not raw material. Production lead time is 15 working days with an MOQ of 1000 pcs. Cost pressure comes from deburring, plating, and 100% inspection. Whether you need 50 pieces for validation or 50,000 for a production line, the same process physics apply, but the process window and inspection level change.

Key Takeaway

Precision metal parts price list 2026 for brass C360 with electropolish Ra 0.2 depends on secondary operations, not raw material. Production lead time is 15 working days with an MOQ of 1000 pcs. Cost pressure comes from deburring, plating, and 100% inspection. Whether you need 50 pieces for validation or 50,000 for a production line, the same process physics apply, but the process window and inspection level change.

Key Takeaway

Precision metal parts price list 2026 for brass C360 parts with electropolish Ra 0.2 follows the same physics whether you need 50 pieces for validation or 50,000 for a production line. Production lead time is 15 working days with an MOQ of 1000 pcs. Cost pressure comes from secondary operations like deburring, plating, and 100% inspection, not raw material. Consolidation rewards suppliers who document process capability.

Related reading: Cold Plate Pressure Drop: Pump and Flow Sizing.

Whether you need 50 pieces for validation or 50,000 for a production line, precision metal parts price list 2026 follows the same physics. What changes is which process window we hold, and how much inspection we put behind it.

Key Specifications at a Glance

ParameterValue / Range
MaterialBrass C360
Surface finishelectropolish Ra 0.2
Lead time (production)15 working days
MOQ (production)1000 pcs

Market and Technical Context

Cost pressure in semiconductor equipment rarely comes from the raw material. It comes from secondary operations: deburring, plating, and 100% inspection. Removing one of those steps usually moves unit cost more than any material substitution.

See also: 3-Axis vs 4-Axis vs 5-Axis CNC Machining: Key Differences Explained.

Consolidation among semiconductor equipment buyers means fewer, larger programs. That rewards suppliers who can document process capability at rather than those who win on a single sample.

How We Manufacture It

Heat treatment and surface treatment are scheduled as controlled steps, not afterthoughts. electropolish Ra 0.2 is applied to a defined thickness range and verified, because variation here causes more field failures than dimensional drift.

Deburring and edge conditioning are specified on the drawing for precision metal parts price list 2026. A sharp edge that passes dimensional inspection can still fail assembly, so edge break is a controlled parameter rather than a cosmetic one.

Final inspection for precision metal parts price list 2026 is sampling-based for general dimensions and 100% for critical features. The split is agreed before tooling, because moving a feature from general to critical changes cost and 15 working days.

Learn more about Custom CNC Collet Chuck 36 Type Hex Bore Auto Lathe Parts.

Material and Surface Finish

Brass C360 is the default for precision metal parts price list 2026 because it holds ±0.002 mm on request predictably and machines without work hardening surprises. Alternatives are quoted when corrosion or conductivity dominates the requirement.

Surface specification for precision metal parts price list 2026 is electropolish Ra 0.2, chosen for the service environment in semiconductor equipment. Thickness is verified on a reference coupon from the same batch rather than assumed from process settings.

Recycled content and RoHS/REACH declarations are available for precision metal parts price list 2026 on request. If your semiconductor equipment customer audits material origin, ask for the mill certificate at quote stage, not at delivery.

Further technical detail: BQUQ TG150 Collet Chuck Heavy Duty CNC Tool Holder Precision Runout.

Tolerance and Inspection

General dimensions on precision metal parts price list 2026 are held to ±0.002 mm on request; critical features are identified on the drawing and controlled separately with a tighter band.

Recommended reading: Surface Finish Options for Stamped Metal Parts: A Guide.

Measurement method is part of the specification. A feature measured on a CMM and the same feature measured with a gauge can disagree, so precision metal parts price list 2026 drawings state how each critical dimension is verified.

Compare it with Data Analytics in Manufacturing: 5 Predictive Models Turning Sensor Data into 2025 Profit.

Process capability is tracked per feature. Where Cpk falls below the agreed threshold on precision metal parts price list 2026, we either adjust the process or reclassify the feature, rather than sorting parts at the end.

Related reading: precision metal parts.

Where It Is Used

In assembly, precision metal parts price list 2026 is usually constrained by the mating part rather than by its own specification. Sharing the interface drawing early prevents the common failure where both parts are in tolerance but will not assemble.

See also: Custom Precision Springs by BQUQ.

Vibration and cycling are the usual life limiters for precision metal parts price list 2026. If the duty cycle is known, we can recommend a surface treatment and hardness combination that extends service life without changing dimensions.

What to Confirm Before Ordering

Define critical features at quote stage. Moving a feature from general ±0.002 mm on request to critical after tooling adds cost and extends 15 working days, which is the most avoidable delay in custom sourcing.

Plan qualification volume separately from production volume. For precision metal parts price list 2026, 1000 pcs is the point where the process is proven; everything before that is process development.

FAQ: Your Questions Before Ordering

What is the minimum order quantity for precision metal parts price list 2026?

General dimensions are held to ±0.002 mm on request. Critical features are identified on the drawing and held to a tighter band, with the measurement method stated so incoming inspection matches ours.

Can you work from our existing drawing?

Prototype quantities start well below production minimums. Production runs for precision metal parts price list 2026 start at 1000 pcs, which is where the process window is proven and unit cost stabilises.

Learn more about Precision Stamped Mounting Plates & Flanges.

Do you provide material and inspection certificates?

Standard lead time for precision metal parts price list 2026 is 15 working days after drawing approval and tooling sign-off. Prototypes are typically faster because they bypass tooling, and repeat orders are faster still because tooling exists.

Further technical detail: Prototype Stamping Without Full Tooling: Soft Dies and Low-Volume Routes.

What surface finishes are available for precision metal parts price list 2026?

Yes. Material certificates, heat-lot traceability, and first-article inspection reports ship with the order. If your semiconductor equipment customer requires additional documentation, specify it at quote stage.

How do you handle a design change mid-program?

Changes are documented against the original first-article report. We identify which dimensions are affected, requote only the affected operations, and tell you whether existing stock of precision metal parts price list 2026 remains usable.

Send the drawing and the annual volume. You will get a manufacturability review, a process route, and a quote that states ±0.002 mm on request, 15 working days, and 1000 pcs explicitly rather than by implication.

precision metal parts price list 2026

Recommended reading: BQUQ CNC Machined Auto Lathe 630 Type Round Bore Spring Collet Chuck.

precision metal parts price list 2026

precision metal parts price list 2026

precision metal parts price list 2026

precision metal parts price list 2026

precision metal parts price list 2026

precision metal parts price list 2026

precision metal parts price list 2026

Key Specifications and Selection Guide

Spec comparison

ParameterValue / Range
MaterialBrass C360
ToleranceNot specified in excerpt
Lead time15 working days
MOQ1000 pcs
Capacity50 to 50,000 pieces

Selection / comparison

OptionBest forTrade-off
Standard production50,000-piece production linesHigher MOQ, longer lead time
Validation run50-piece validationHigher unit cost, less inspection
Electropolish Ra 0.2Surface-critical semiconductor partsAdded cost and process control
Deburring and edge conditioningParts with sharp edges or burrsExtra secondary operation cost
100% inspectionHigh-reliability applicationsSignificant cost increase

Process / inspection

StageControlRecord
Heat treatmentControlled step, not afterthoughtProcess parameters documented
Surface treatmentElectropolish Ra 0.2 applied to defined thickness rangeThickness verification record
DeburringSpecified on drawing for precision metal partsEdge conditioning record
Inspection100% inspection when requiredInspection data retained
Process capabilityDocumented at production volumeCapability report available

Frequently Asked Questions

What is the production lead time for precision metal parts in 2026?

Production lead time is 15 working days for brass C360 parts with electropolish Ra 0.2. This applies to orders meeting the 1000-piece MOQ. For 50-piece validation runs, lead time may differ. Always confirm scheduling before ordering.

What is the minimum order quantity (MOQ) for production?

The MOQ for production is 1000 pcs. Validation runs can be as low as 50 pieces, but unit cost is higher because setup and inspection are spread over fewer parts. The same physics apply, but the process window and inspection level change.

Why does secondary operations drive cost more than raw material?

Cost pressure in semiconductor equipment rarely comes from raw material. It comes from secondary operations: deburring, plating, and 100% inspection. Removing one of those steps usually moves unit cost more than any material substitution. For brass C360 with electropolish Ra 0.2, these steps are critical.

What surface finish is available for precision metal parts?

Electropolish Ra 0.2 is a standard surface finish for brass C360 precision metal parts. It is applied to a defined thickness range and verified, because variation here causes more field failures than dimensional drift. Confirm surface finish requirements on your drawing before ordering.

How do you control heat treatment and surface treatment?

Heat treatment and surface treatment are scheduled as controlled steps, not afterthoughts. Electropolish Ra 0.2 is applied to a defined thickness range and verified. Deburring and edge conditioning are specified on the drawing for precision metal parts. Records are kept for each stage.

What should I confirm before ordering precision metal parts?

Confirm material (brass C360), surface finish (electropolish Ra 0.2), lead time (15 working days), MOQ (1000 pcs), and whether you need 50-piece validation or 50,000-piece production. Also confirm deburring, edge conditioning, and inspection requirements. Document process capability at production volume.

Can you handle both small validation runs and large production lines?

Yes. Whether you need 50 pieces for validation or 50,000 for a production line, precision metal parts price list 2026 follows the same physics. What changes is which process window we hold, and how much inspection we put behind it. MOQ for production is 1000 pcs, lead time 15 working days.

Key Specifications and Selection Guide

Spec comparison

ParameterValue / Range
MaterialBrass C360
ToleranceStandard precision machining tolerance (e.g., ±0.05 mm)
Lead time15 working days
MOQ1000 pcs
Capacity50 to 50,000 pcs

Selection / comparison

OptionBest forTrade-off
50 pcs validationPrototype and design verificationHigher unit cost due to setup and inspection
1000 pcs pilotSmall batch productionBalanced cost and lead time
50,000 pcs productionMass productionLowest unit cost but requires stable process window
Electropolish Ra 0.2Surface-critical applicationsAdds secondary operation cost and lead time
100% inspectionHigh-reliability industriesSignificant cost increase versus sampling

Frequently Asked Questions

What is the production lead time for precision metal parts in 2026?

Production lead time is 15 working days for brass C360 parts with electropolish Ra 0.2, regardless of order size from 50 to 50,000 pieces. This assumes standard process windows and no expedited shipping.

What is the minimum order quantity (MOQ) for production?

The MOQ for production is 1000 pcs. For validation quantities like 50 pieces, we can accommodate but unit cost will be higher due to setup and inspection overhead.

Why is cost pressure not from raw material?

Cost pressure comes from secondary operations like deburring, plating, and 100% inspection. Removing one of those steps usually moves unit cost more than any material substitution, especially for brass C360.

Can you handle both small validation batches and large production runs?

Yes. We support 50 pieces for validation and 50,000 for production. The same physics apply, but we adjust the process window and inspection level accordingly to balance cost and quality.

What surface finish can you achieve with electropolish?

We achieve electropolish Ra 0.2 on brass C360 parts. This is a standard secondary operation that improves surface finish and corrosion resistance but adds cost and lead time.

How do you control quality during production?

We control quality at each stage: incoming material verification, in-process machining checks, deburring inspection, electropolish verification, and final inspection. Records are maintained for traceability.

What should I confirm before ordering precision metal parts?

Confirm material grade, surface finish, tolerance, quantity, lead time, and inspection requirements. Also clarify if 100% inspection is needed, as it significantly affects cost and lead time.

Compare it with Hardware Stamping for Home Appliances: What Gets Stamped and Why.

Frequently Asked Questions

What is the price for 1000 pcs of brass C360 parts with electropolish Ra 0.2?

The price depends on secondary operations like deburring, plating, and 100% inspection, not raw material. For 1000 pcs, expect a unit price that reflects setup and inspection costs. Lead time is 15 working days. Request a quote with your specific tolerances for accurate pricing.

What is the MOQ for precision metal parts?

The MOQ is 1000 pcs for production orders. However, we can accommodate 50 pieces for validation, but the unit cost will be higher due to setup and inspection. The process physics remain the same, but the process window and inspection level change.

What is the lead time for 50,000 pcs?

Production lead time is 15 working days for standard orders. For 50,000 pcs, the lead time may be similar if capacity allows, but we recommend confirming scheduling. Cost pressure comes from deburring, plating, and 100% inspection, not raw material.

Why does electropolish Ra 0.2 increase cost?

Electropolish Ra 0.2 is a secondary operation that adds cost due to additional processing and inspection. It improves surface finish and corrosion resistance. Cost pressure comes from deburring, plating, and 100% inspection, not raw material.

What tolerances can you hold for brass C360?

We hold standard precision machining tolerances, typically ±0.05 mm or better, depending on feature size. For critical dimensions, we apply 100% inspection. The process window and inspection level change based on order quantity and requirements.

Do you provide material certificates?

Yes, we provide material certificates for brass C360. We document process capability and inspection records. This ensures traceability and quality. Consolidation rewards suppliers who document process capability.

What is the cost driver for precision metal parts?

Cost pressure comes from secondary operations like deburring, plating, and 100% inspection, not raw material. For brass C360 with electropolish Ra 0.2, these operations dominate the price. Lead time is 15 working days with an MOQ of 1000 pcs.

Related Reading



Contact Us Quote
Get A Quote
We use cookie to improve your online experience. By continuing to browse this website, you agree to our use of cookie.

Cookies

Please read our Terms and Conditions and this Policy before accessing or using our Services. If you cannot agree with this Policy or the Terms and Conditions, please do not access or use our Services. If you are located in a jurisdiction outside the European Economic Area, by using our Services, you accept the Terms and Conditions and accept our privacy practices described in this Policy.
We may modify this Policy at any time, without prior notice, and changes may apply to any Personal Information we already hold about you, as well as any new Personal Information collected after the Policy is modified. If we make changes, we will notify you by revising the date at the top of this Policy. We will provide you with advanced notice if we make any material changes to how we collect, use or disclose your Personal Information that impact your rights under this Policy. If you are located in a jurisdiction other than the European Economic Area, the United Kingdom or Switzerland (collectively “European Countries”), your continued access or use of our Services after receiving the notice of changes, constitutes your acknowledgement that you accept the updated Policy. In addition, we may provide you with real time disclosures or additional information about the Personal Information handling practices of specific parts of our Services. Such notices may supplement this Policy or provide you with additional choices about how we process your Personal Information.


Cookies

Cookies are small text files stored on your device when you access most Websites on the internet or open certain emails. Among other things, Cookies allow a Website to recognize your device and remember if you've been to the Website before. Examples of information collected by Cookies include your browser type and the address of the Website from which you arrived at our Website as well as IP address and clickstream behavior (that is the pages you view and the links you click).We use the term cookie to refer to Cookies and technologies that perform a similar function to Cookies (e.g., tags, pixels, web beacons, etc.). Cookies can be read by the originating Website on each subsequent visit and by any other Website that recognizes the cookie. The Website uses Cookies in order to make the Website easier to use, to support a better user experience, including the provision of information and functionality to you, as well as to provide us with information about how the Website is used so that we can make sure it is as up to date, relevant, and error free as we can. Cookies on the Website We use Cookies to personalize your experience when you visit the Site, uniquely identify your computer for security purposes, and enable us and our third-party service providers to serve ads on our behalf across the internet.

We classify Cookies in the following categories:
 ●  Strictly Necessary Cookies
 ●  Performance Cookies
 ●  Functional Cookies
 ●  Targeting Cookies


Cookie List
A cookie is a small piece of data (text file) that a website – when visited by a user – asks your browser to store on your device in order to remember information about you, such as your language preference or login information. Those cookies are set by us and called first-party cookies. We also use third-party cookies – which are cookies from a domain different than the domain of the website you are visiting – for our advertising and marketing efforts. More specifically, we use cookies and other tracking technologies for the following purposes:

Strictly Necessary Cookies
These cookies are necessary for the website to function and cannot be switched off in our systems. They are usually only set in response to actions made by you which amount to a request for services, such as setting your privacy preferences, logging in or filling in forms. You can set your browser to block or alert you about these cookies, but some parts of the site will not then work. These cookies do not store any personally identifiable information.

Functional Cookies
These cookies enable the website to provide enhanced functionality and personalisation. They may be set by us or by third party providers whose services we have added to our pages. If you do not allow these cookies then some or all of these services may not function properly.

Performance Cookies
These cookies allow us to count visits and traffic sources so we can measure and improve the performance of our site. They help us to know which pages are the most and least popular and see how visitors move around the site. All information these cookies collect is aggregated and therefore anonymous. If you do not allow these cookies we will not know when you have visited our site, and will not be able to monitor its performance.

Targeting Cookies
These cookies may be set through our site by our advertising partners. They may be used by those companies to build a profile of your interests and show you relevant adverts on other sites. They do not store directly personal information, but are based on uniquely identifying your browser and internet device. If you do not allow these cookies, you will experience less targeted advertising.

How To Turn Off Cookies
You can choose to restrict or block Cookies through your browser settings at any time. Please note that certain Cookies may be set as soon as you visit the Website, but you can remove them using your browser settings. However, please be aware that restricting or blocking Cookies set on the Website may impact the functionality or performance of the Website or prevent you from using certain services provided through the Website. It will also affect our ability to update the Website to cater for user preferences and improve performance. Cookies within Mobile Applications

We only use Strictly Necessary Cookies on our mobile applications. These Cookies are critical to the functionality of our applications, so if you block or delete these Cookies you may not be able to use the application. These Cookies are not shared with any other application on your mobile device. We never use the Cookies from the mobile application to store personal information about you.

If you have questions or concerns regarding any information in this Privacy Policy, please contact us by email at . You can also contact us via our customer service at our Site.